| Location: | Udmurt Republic |
| Year of construction | 2012 |
| Purpose | Fish farm |
| Width | 24 m. |
| Length | 100 m. |
| The highest point | 6 m. |
| Gates (roll-up awning gates) 4 pieces | 4x4,5 m. |
| Additional equipment |
Lighting and power supply system; Ventilation system; Heating system. |